Notice to Resume Work or of Measures Satisfied – Plains Midstream Canada ULC (Plains) – Order LMR–001–2024

Notice to Resume Work or of Measures Satisfied – Plains Midstream Canada ULC (Plains) – LMR–001–2024 [PDF 108 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:

Plains Midstream Canada ULC (Plains) that the hazardous or detrimental situation described in Order No. LMR-001-2024 (IOO) has been partially remedied to the satisfaction of the Inspection Officer.

Therefore,

  •     suspended work may resume, and/or

  •      the measures specified in the Order have been satisfied.

  •  X  Plains Midstream Canada ULC (Plains) has satisfied Measures 1, 2, and 3 of the IOO LMR-001-2024.

Specified Measure 4 - Corrective and Preventative Plan (CAPA), as well as Measure 5 - Application to the Commission, and Measure 6 – Quarterly Updates, of the IOO remains in effect.

Inspection Officer

Inspection Officer

30 April, 2026

Date

 
REDACTED
 
 
REDACTED
 

IO Designation Number

Signature

210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA or incident #: CV2425-108, CV2425-345, REM-0309

Date modified: